Notes from Team at Blood Falls

November 30, 2008

Kristof sent some emails and pictures from the camp. They have wireless access at the main Lake Bonney camp, which is 40 min by ATV from Blood Falls camp, where the team is staying. They celebrated Thanksgiving at the Lake Bonney Camp.  They started melting the second melthole on Saturday. Below are the pictures and captions sent by Kristof.

Nov 26

Bill at our camp with Blood Falls in the background.

Bill at our camp with Blood Falls in the background.

Unpacking the helo loads at the melthole.

Unpacking the helo loads at the melthole.

Maciej and Annika arriving at Blood Falls camp from L. Bonney Camp. Only Annika is seen in the picture.

Maciej and Annika arriving at Blood Falls camp from L. Bonney Camp. Only Annika is seen in the picture.

Nov 27

Bill and Peter checking level on the floor beams.

Bill and Peter checking level on the floor beams.

Vickie working on the floor.

Vickie working on the floor.

Nov 28
Setting up the Hotsy for melthole.

Setting up the Hotsy for melthole.

Bob and Bart in our red living room Polar Haven at Blood Falls Camp.

Bob and Bart in our red living room Polar Haven at Blood Falls Camp.

 Nov 29
Thanksgiving dinner at L. Bonney Camp.

Thanksgiving dinner at L. Bonney Camp.

Walking by the ventifacts near L. Bonney Camp.

Walking by the ventifacts near L. Bonney Camp.